2411 Perez Ave
/?php the_post_thumbnail(); ?>
Project Location: 2411 Perez Ave
- Gutters removed
- Chimney cricket/diverter installed
- Chimney reflashed
- 2-ply roll roofing installed

3/12 pitch roof with no attic exhaust. Warped and dry-rotted plywood found in various places.

Before picture of brick chimney with old flashing and no cricket/diverter installed.

Installed attic exhaust where none previously existed.

After chimney cricket/diverter installation and new flashing.

Front of home before and after dry-in stage. Decking re-nailed and all inspections passed to begin shingle installation.

Low slope valley area with 2-ply modified installed and new fascia.

Another good view of tar/gravel roof. Lower roof has a secondary water barrier installed to prevent leaks.

Tar/gravel removed and new 2-ply modified roll roofing installed.

Existing tar and gravel roof with old repairs and several leaks.

Fascia board and roof decking replaced at various places.





/?php comments_template(); ?>